Queen’s Walk, London

The Queen’s Silver Jubilee was marked with the creation of the Jubilee Walkway, an integral part of which was the introduction of pedestrian access along the south bank of the Thames, known as Queen’s Walk.

 

As part of preparations for the Diamond Jubilee thirty five years later Lambeth Council made the decision to have the area ‘smartened up’. Part of this operation was to replace the worn resin bound surfacing on the Queen’s Walk between Waterloo and Blackfriars bridges. The surfacing needed to be laid in time for the Jubilee celebrations which would attract many tourists, particularly for the Jubilee Pageant when crowds would line the banks of the Thames watching over 1,000 vessels participate in a flotilla from Battersea to Tower Bridge.

 

FM Conway were contracted to lay new resin bound surfacing to 2700 square metres of the 5 metre wide pathway and Sesame Gold aggregate was selected to brighten up the route.

 

The RonaDeck Resin Bound Surfacing System was supplied as a two-component UV stable polyurethane resin, the two components were mixed with a slow speed drill and paddle before being added to a large forced action mixer containing the Sesame Gold aggregate blend.  FM Conway spread the RonaDeck Resin Bound Surfacing to level and smoothed the surface with a steel float.  The finished surface was ready for foot traffic within four hours.

 

Ronadeck Resin Bound Surfacing satisfies SuDS requirements, allowing rainwater to quickly and easily drain through the porous surface, avoiding puddling.  Slip testing shows risk of slip to be generally low, an important consideration for a busy walkway.

 

The resin bound surfacing was completed in time for the crowds to watch the Jubilee Pageant. Now the ‘golden path’ provides a route which takes tourists and commuters past many well known buildings and locations in the capital city. Starting at Waterloo Bridge it runs past the National Film Theatre and the National Theatre through Gabriel’s Wharf, past the IBM building and London Television Centre alongside Bernie Spain Gardens and through Oxo Tower Wharf passing the art-deco Oxo Tower and Sea Containers House, finishing at Blackfriars Bridge close to the Tate Modern.

DRYING OF SCREEDS

BS 8204-1 “Concrete bases and cementitious levelling screeds to receive floorings — Code of practice” section 6.11.1 suggests the following calculation for drying of screeds with no fast drying additi ...

Read more

AVOIDANCE/ MITIGATION OF THE EFFECTS OF COMMON FORMS OF CRACKING IN CEMENTITIOUS SCREEDS

Aggregate is usually 0–4 mm and is mixed with cement in the ratio of 1:3 or 1:4 cement to sand, depending on strength requirements and drying requirements. For total screed thicknesses in excess of 50 ...

Read more

Carbonation of Reinforced Concrete

Carbonation is the single most common cause of reinforcement corrosion in above ground structures and although many construction professionals and contractors are familiar with the progression of carb ...

Read more

Here to help...